Is it possible to change parameter values dynamically in a JCL without human intervenction?
Can the job scheduler do date arithmetic to determine the value that it needs to dynamically included in the JCL?
Joined: 26 Apr 2004 Posts: 3296 Location: Charlotte,NC USA
Well, you haven't as of yet mentioned what job scheduling system you're using. Most likely, though, yes, the scheduling system would need this process to be coded in REXX.